Kuala Lumpur, MY
← All original pages

NGO STUDIO | Parasitic Architecture

Original website record. Dates, status, office details and wording reflect the source page and may be historical.

Visit original page ↗

Client

Completion

Location

Size

Team

PAM Malaysia

2013

Kuala Lumpur | Malaysia

350 m

Henry Ngo, Ho Kat Jing, Keith Tan

PARASITIC ARCHITECTURE

KUALA LUMPUR

PLUGGING INTO THE SYSTEM

a

Parasitic Architecture as an adaptable transient and exploitive from of architecture that forces relationships with host buildings in order to complete themselves. It cant sustain their own existence without siphoning energy from the surplus supply demonstrated in host buildings. Through the process of exploration, aiming to localize the subject of parasitic architecture into a single available resource. The Notion of basic survival system plug into the host infrastructure [ Factory Chimney ] by tapping into its waste management. That makes the relationship of Parasite Architecture.

A-BIJIO TABLE

RETURN TO ARCHITECTURE

Stay Up To Date

To receive emails about our new projects and current progress, please add your email address below.